Installing A Tub Surround. You can choose from new tile, plastic tub surround kits and professionally installed solid-surface panels. At the joint between the tub and surround and the. Tub surrounds and shower surrounds are easy to install and maintain. Follow our ten steps to update your bathroom with a surround. Installation can vary from product to product, so read the manufacturer\'s instructions carefully.
Hopefully you’ve successfully that was in the space and now its time to install a beautiful new one. There are certain steps that are usually done in chronological order to make the project go smoother. Be sure to have the correct tools on hand and follow the manufacturer’s installation instructions.
If you are an avid DIYer, you can complete this project yourself in a day or so. Installing a New Tub 1. Positioning A New Tub.
Fit the new tub exactly against the studs. If the space is too long, to use as a shelf.
Rough-in the and plumbing. Most new tubs have only two holes: the drain and the overflow.
Some luxury tubs have one or two faucet mounts on the rim of the tub. The must be installed and connected before putting the tub in place. A typical assembly is ½-inch cold water and ½-inch hot water supply pipes connecting to a mixer valve (faucet). A short ½-inch pipe runs down from a valve and terminates in an elbow with a short stub, to which the spot is connected later.
See also: Another ½-inch pipe runs from the valve and connects to an elbow with a short stub, to which the shower-head is connected later. When buying a faucet, specify whether the connection will be soldered copper (CU) or threaded fittings (IP). Installing an Access Panel.
Most require that bathtub plumbing be accessible. When the tub is on the ground floor, this access can be from the or crawl space below. Just cut a hole in the floor, approximately 8 by 12 inches, under the head of the tub. If the tub is steel or plastic, you will have to nail either 2 by 4 or 1 by 6 cleats to the studs to rest the flange on. Be sure these boards are exactly the right height and are level. The instruction sheet provided with the tub will provide proper dimensions. Before setting the tub into place, make sure there is plenty of room to work on the drain from below the floor or through the access door.
Even on an upstairs floor it is a good idea to remove some of the adjacent to the access opening. It is customary to wait until the tub is in place before finishing the bathroom floor, but if you are installing you may want to wait until it has been laid before positioning the tub.
If the tub is installed first, the flooring has to be butted up against the tub. Unless this joint is and sealed very thoroughly, will lift the flooring and may cause structural damage in time. Installing the tub after prevents this problem. Positioning the Tub. First, stuff insulating materials into hollow cavities around the tub (this will help to keep the bath water warm).
Then slide the tub in place against the studs. Rest the flange on the cleats and screw it to the studs. Installing the Drain.
The rough plumbing for the drain should be a 1 ½-inch diameter trap below floor level with the inlet centered directly beneath the drain. It should have a slip nut or other means to connect to the waste-and-overflow pipe coming from the tub. The tub itself does not come with any pipes, so you have to get a tub drain assembly, which consists of the drain arm, overflow pipe, and connecting tee. Assemble this unit according to the manufacturer’s directions and place it into position. You will need a helper to hold it.
Then, working from the inside of the tub, put lots of plumber’s putty around the drain hole and screw in the strainer fitting. Tighten it by inserting the plastic coated handles of a pair of pliers or a special wrench for this purpose. Do not over tighten; just make it snug.
Install the overflow cover with the screws that came with it. Descargar virtualbox con windows xp incluido en. Then, working under the tub, connect the overflow assembly to the trap by tightening the compression nut with a spud wrench or spanner. Test the drain with a few buckets of water. Then install the.
...'>Installing A New Bathtub And Surround(05.01.2019)Installing A Tub Surround. You can choose from new tile, plastic tub surround kits and professionally installed solid-surface panels. At the joint between the tub and surround and the. Tub surrounds and shower surrounds are easy to install and maintain. Follow our ten steps to update your bathroom with a surround. Installation can vary from product to product, so read the manufacturer\'s instructions carefully.
Hopefully you’ve successfully that was in the space and now its time to install a beautiful new one. There are certain steps that are usually done in chronological order to make the project go smoother. Be sure to have the correct tools on hand and follow the manufacturer’s installation instructions.
If you are an avid DIYer, you can complete this project yourself in a day or so. Installing a New Tub 1. Positioning A New Tub.
Fit the new tub exactly against the studs. If the space is too long, to use as a shelf.
Rough-in the and plumbing. Most new tubs have only two holes: the drain and the overflow.
Some luxury tubs have one or two faucet mounts on the rim of the tub. The must be installed and connected before putting the tub in place. A typical assembly is ½-inch cold water and ½-inch hot water supply pipes connecting to a mixer valve (faucet). A short ½-inch pipe runs down from a valve and terminates in an elbow with a short stub, to which the spot is connected later.
See also: Another ½-inch pipe runs from the valve and connects to an elbow with a short stub, to which the shower-head is connected later. When buying a faucet, specify whether the connection will be soldered copper (CU) or threaded fittings (IP). Installing an Access Panel.
Most require that bathtub plumbing be accessible. When the tub is on the ground floor, this access can be from the or crawl space below. Just cut a hole in the floor, approximately 8 by 12 inches, under the head of the tub. If the tub is steel or plastic, you will have to nail either 2 by 4 or 1 by 6 cleats to the studs to rest the flange on. Be sure these boards are exactly the right height and are level. The instruction sheet provided with the tub will provide proper dimensions. Before setting the tub into place, make sure there is plenty of room to work on the drain from below the floor or through the access door.
Even on an upstairs floor it is a good idea to remove some of the adjacent to the access opening. It is customary to wait until the tub is in place before finishing the bathroom floor, but if you are installing you may want to wait until it has been laid before positioning the tub.
If the tub is installed first, the flooring has to be butted up against the tub. Unless this joint is and sealed very thoroughly, will lift the flooring and may cause structural damage in time. Installing the tub after prevents this problem. Positioning the Tub. First, stuff insulating materials into hollow cavities around the tub (this will help to keep the bath water warm).
Then slide the tub in place against the studs. Rest the flange on the cleats and screw it to the studs. Installing the Drain.
The rough plumbing for the drain should be a 1 ½-inch diameter trap below floor level with the inlet centered directly beneath the drain. It should have a slip nut or other means to connect to the waste-and-overflow pipe coming from the tub. The tub itself does not come with any pipes, so you have to get a tub drain assembly, which consists of the drain arm, overflow pipe, and connecting tee. Assemble this unit according to the manufacturer’s directions and place it into position. You will need a helper to hold it.
Then, working from the inside of the tub, put lots of plumber’s putty around the drain hole and screw in the strainer fitting. Tighten it by inserting the plastic coated handles of a pair of pliers or a special wrench for this purpose. Do not over tighten; just make it snug.
Install the overflow cover with the screws that came with it. Descargar virtualbox con windows xp incluido en. Then, working under the tub, connect the overflow assembly to the trap by tightening the compression nut with a spud wrench or spanner. Test the drain with a few buckets of water. Then install the.
...'>Installing A New Bathtub And Surround(05.01.2019)